Case Study: Four Years, Two Plants. QLX9 at Feralpi Group
Four Years, Two Plants. QLX9 at Feralpi Group
Acciaierie di Calvisano first tested the QLX9 in 2022. Four years later the analyzer is part of daily process control, and the sister plant in Riesa runs its own.
| Customer | Feralpi Group |
| Plants | Acciaierie di Calvisano, Italy, and ESF Elbe-Stahlwerke Feralpi, Riesa, Germany |
| Applications | EAF, ladle furnace and ferroalloys at both plants |
| Calvisano | First tests in 2022, current system installed in November 2024 |
| Riesa | Installed in November 2024 |
From the first test to daily routine
Calvisano was our first QLX9 customer. In 2022 the analyzer went into their working melt shop, with dust, heat, shift changes and real slag.
We learned a lot there. Calibration, handling and robustness of today's QLX9 carry the experience of these years. What began as a test became a tool the operators use every day.
The statement
We first tested the QLX9 in 2022. It has been running at our plant as part of our daily process control. The ROI became clear very quickly. Based on these results, our sister plant in Riesa installed its own QLX9 in 2024.
Vincenzo Duro, Production Manager Steel Plant, Acciaierie di Calvisano S.p.A., Feralpi Group, Italy
The second plant
In November 2024 Calvisano received its current system and Riesa its first QLX9, within two weeks: Calvisano on 14 November, Riesa on 27 November. Both use the QLX9 for EAF slag, ladle furnace slag and ferroalloys.
Riesa built on the results of its sister plant in Italy.
What four years show
A measurement that works in a demonstration is one thing. A measurement that runs for four years in daily production, through changing scrap, changing crews and changing targets, is another.
Feralpi has seen the QLX9 grow from an early system to today's analyzer, and stayed with it. For us that is the strongest kind of reference: a customer who knows the product from its first day and decided for it a second time.
Would you like to know what fast slag analysis can do at your furnace? Get in touch with us. More background is in the first case study.
More case studies: 18 months at the converter at Zenith Steel Group and Six months to the second system at Pittini Group.
Laser OESValidation and Standardization: Why Drift Monitoring Stays Essential in OESControl and correction samples in daily operation.
GuideOES Slag Analysis: Off-Line, At-Line, or In-LineA practical guide to where the analyzer should stand.
Case studyMore Yield, Less Cost: Fast Slag Analysis in VeronaEAF and ladle furnace at Acciaierie di Verona, Pittini Group.